Loading Projects

Load a saved project to restore your entire production setup instantly.

How to load

  1. Open SettingsProject
  2. Browse your saved projects
  3. Select the project to load
  4. Tap Load
  5. Your production state is restored

What happens on load

When you load a project:

  • All source slots are configured with their saved sources
  • Scenes are recreated with their layer assignments
  • Audio levels, mute states, and routing are restored
  • Transition settings are applied
  • Streaming configuration (platform, key, bitrate) is restored
  • Overlay content and positions are set up

Network sources

Sources that depend on network connectivity (NDI, iPhone cameras) will attempt to reconnect:

  • NDI sources — pMix rediscovers them on the network. If the same NDI source is available, it reconnects automatically
  • iPhone cameras — The pMix Camera app needs to be running on the iPhone. The iPad will attempt to reconnect

If a network source isn’t available when the project loads, its slot shows an error state until the source comes online.

Transitioning between projects

Loading a new project replaces the current state entirely. If you want to preserve your current setup:

  1. Save the current state as a project first
  2. Then load the new project

Tips

  • Pre-show routine — Load your project 15–30 minutes before showtime to allow network sources time to reconnect
  • Verify after loading — Check that all sources are connected, audio levels are correct, and overlays look right
  • Stream keys — Stream keys are saved with the project. If your platform uses rotating keys (e.g., Facebook), update the key after loading